Madison Bike Week is from June 1 through June 8, 2024!
Categories
Weekly Update

Bikes and the North/South BRT Focus Group

A person rides their bike on the Southwest Path. Everything is solidly covered in fresh snow and it is still actively snowing. No people other than the person on the bike are visible.
Snowy cycling from years past (Cyclists of Madison)

*mumbling to myself* Argh, I don’t know. Studs? Too soon? Yes, too soon. Don’t overreact. *deep breath* Just try to get past the next few days and we should be good again for a bit.

This week

On Monday at 6 PM, join an online session hosted by Madison Bikes (registration) where we’ll be on the receiving end of a presentation from city transit officials about how bikes and the BRT systems will complement each other. This one will focus on the North/South (“B”) route that’s in active planning mode. From Robbie’s event description:

Madison’s first bus rapid transit (BRT) route, going from Junction Road on the West side to East Towne Mall on the East side, is still under construction. But the city and Metro are already preparing for a second route, connecting the north and south side. If all goes well, the route could be in operation as early as 2028.

The project will involve a reconstruction of Park St, and potential changes to the setup of streets such as Fish Hatchery Rd, Packers Ave, and Sherman Ave. A lot of these changes will have an impact on people biking, and getting the route and the design right is important for improving our city’s all-ages-and-all-abilities bike network. Join our meeting for a presentation from Metro and an opportunity to ask questions and provide comment!

On Monday at 7 PM, Bike Fitchburg is hosting their monthly meeting at the Saris facility off of Verona Rd. In addition to the normal meeting agenda items, attendees will get a tour of the facility from Jeff Iverson, Saris Director of Engineering. Sounds fun! From Bike Fitchburg: “All who live, work, and/or bike in Fitchburg are welcome to join their voices with ours to make our city an easier, safer, more fun, and more equitable place to bike!”

On Wednesday at 5 PM the Transportation Commission meets virtually. You can watch online here and check out the full agenda. One item to note is that the city is applying for federal TAP funding (2024-2028) for the following bike path projects:

  1. Moorland Rd Shared Use Path – Capital City Trail to Wayland Dr: Improvements include new shared-use path and improved bus stop safety and accessibility.
  2. W Beltline Frontage Rd Shared Use Path – East of Seminole Hwy to Landmark Pl: Improvements include continuation of shared-use path to fill gap in pedestrian network and continue all ages and ability bike connection to neighborhood. Improved safety and accessibility of bus stops.
  3. Woodland Dr Path – Sheridan Dr to Marcy Rd: New shared-use path along Woodland Dr to connect to Sheridan Dr path, Warner Park path at Forster Dr and Marcy Dr.
  4. E Rusk Path Extension – N Rusk Ave to Rimrock Rd: New shared-use path that will connect to new paths planned for construction along N Rusk/W Badger and Rimrock Rd.

Last Week

On Tuesday the Board of Public Works met to produce their recommendation on the layout of the proposed multi-use path along the North side of Mineral Point Rd. One issue under discussion is where and how often the path would be narrowed to 5′ vs the 8′ baseline. Previously, recommendations had been produced from both city staff and the Transportation Commission with the city staff preferring more reductions to 5′ widths along the corridor and the TC preferring fewer reductions that require a few more tree removals (see slide).

Slide from Tom Lynch, Director of Transportation for the City of Madison

In this case, the Board of Public Works voted to recommend a middle ground between the staff and TC recommendations (leaning more towards the city staff recommendation). They suggest requiring 8′ at Clock Tower, but settle for 5′ at Kwik-Trip, Nautilus Park, and Isle of View Apts. Alders Slack, Conklin and Tishler all expressed opposition to the TC plan (and presumably support for the city staff plan).

The work now heads to the Common Council who will take the three different recommendations into account when deciding on the final layout.

As always, you can find an overview of all bike events on our Community Bike Calendar. Email us at info@madisonbikes.org to add your events. And if you value our newsletter and other work, consider donating to Madison Bikes. For construction updates, check out the city’s Bike Madison page.

Categories
Weekly Update

What a week!

It was quite a week for events involving Madison Bikes. I hope everyone had a chance to attend one or more of them.

Week in review

First up was our Car-Free Holiday Fantasy in Lights on Tuesday (check out the link for a great video from the evening.) The weather couldn’t have been better, and we ended up with about 900 people walking, biking, running, and strolling through. It seems that people spread the word via bike groups and clubs, neighbors, print and TV media, word of mouth, as well as our Facebook group and event. There were tons of families with little kids, a few dogs, friends chatting, bike and running groups going through together, and lots of smiles and laughter. 

After our two-hour car-free time slot, we headed over to the Sheraton on John Nolen Dr for socializing, special drinks, and even VIP indoor bike parking. Thanks to everyone who helped out, and to Wonderstate Coffee for hot beverages in Olin Park and the Sheraton for rolling out the red carpet and providing hot chocolate.

Wednesday evening was Be Bright with the UW Police Dept. and the City of Madison on W. Dayton St near Union South. At this event, the UWPD stops bicyclists without lights, but instead of a $150 ticket, they are escorted over to tables where volunteers provide them with a free set of lights and attach the lights to their bikes. Thanks to our volunteers for stepping up at the last minute the day after our big Olin Park event.

Tour of Atwood facilities. I also had an opportunity on Wednesday to join a tour with city staff to the new Atwood path. We learned about some of the innovative path, intersection, and signal treatments that the city has installed. I wish I had recorded the explanations each time we stopped, because there was just too much to remember. But Atwood should be much easier to cross — at least north of Walter Street — as there is only one lane southbound, the intersections are much narrower than before, encouraging slower speeds. Several intersections have green paint to draw drivers’ attention to where pedestrians and bicyclists are likely to be crossing. 

Thanks for for inviting me to ride along. It’s great that about a dozen city staff all traveled by bike to learn about how Madison is making this corridor safer and more intuitive for bicyclists.

Thursday I spoke at the World Day of Remembrance press conference at the top of State St. Shoes were painted white and hung up next to the Veterans Museum to honor the 68 people who died in traffic crashes in Madison over the last five years. You can watch the entire press conference online.

Unfortunately, if we have one more fatality in 2023, this will be the deadliest year in the last 15. Traffic fatalities have been up across the country since the COVID shut down. Fewer people may be driving to work, but with emptier streets, speeds are up, which has led to more dangerous roads. Over 46,000 people died as a result of traffic violence last year! In most years, between 30,000 and 40,000 people die on our streets due to motor vehicle crashes. As I’ve said before, any other consumer product with that kind of safety record would be pulled from the market in a week.

City budget. Among all the events last week, the city also passed a budget in one evening, which is highly unusual. Alder Isadore Knox introduced a last minute amendment to cut funding for the important Autumn Ridge Path project that will allow pedestrians and bicyclists to travel from Milwaukee St to Commercial Ave and provide a bridge over Hwy 30 east of Stoughton Rd. Presently, making that journey requires negotiating two roundabouts on Thompson Dr at Hwy 30 that tend to be very high-speed and unfriendly to all not driving. Fortunately, the motion failed. Thanks to those who wrote to support this project that has already received federal funding.

The week ahead

The week ahead will be fairly quiet because of a short week for Thanksgiving. 

Monday

The Board of Public Works will be discussing the Mineral Point Rd project. Although the Transportation Commission recommended that an 8-10 foot path be built the entire length of the project, the BPW could recommend something else before it goes to Council. It would be great if a few people drop them a note or testify via Zoom about why we need at least an adequate path along Mineral Point Rd. This is already a compromise over what was promised when BRT and changes to Mineral Point Rd was first discussed. The option that was proposed before the Transportation Commission meeting would have narrowed the sidewalk/path to only five feet in sections.

Reminders and announcements

Monday, Nov 27

Bikes and N/S BRT. This is just a save-the-date reminder that we will be hosting a focus group on the north-south BRT line and bicyclists’ needs for the corridor. More information and a registration link can be found here.

Cooperative Carshare Survey

A local group is trying to reduce car dependency in Madison by expanding access to carshare. Their goal is to help others make the leap to being car-free or car-light households, paving the way for the city to become an even more biking- and pedestrian-friendly place to live. They are interested in knowing how people might use car-sharing and what you do/don’t like about this option. You can take their survey and let them know a few things about your driving habits and needs for carshare.

As always, you can find an overview of all bike events on our Community Bike Calendar. Email us at info@madisonbikes.org to add your events. And if you value our newsletter and other work, consider donating to Madison Bikes. For construction updates, check out the city’s Bike Madison page.

Categories
Weekly Update

Holiday Fantasy in Lights and Mineral Point Rd

Car-free Holiday Fantasy in Lights

The highlight of this week is definitely our Car-Free Holiday Fantasy in Lights event. On Tuesday, you’ll have the opportunity to enjoy Holiday Fantasy in Lights for two hours without having to worry about cars. Our Facebook event has over 1,800 people “interested,” which may be a record for any Madison Bikes event! From 5-7 pm, come bike, walk, or roll with us in Olin Park and enjoy a free coffee or hot chocolate provided by our friends at Wonderstate Coffee! And after you’ve done a loop or two, ride over to the Sheraton Madison for a social gathering from 6-8pm in their recently renovated lounge/bar space called the HUB! There may be drink specials. Please consider throwing some cash into the Holiday Fantasy in Lights collection boxes if you enjoyed the event.

Transportation Commission approves Mineral Point Rd widened sidewalk

The proposal to add a partially widened sidewalk to Mineral Point Road as part of the bus rapid transit (BRT) project was on the Transportation Commission’s agenda last week.

You can read an in-depth analysis of the project in a previous post. Here’s a high-level overview: BRT buses will be running in the center lanes of Mineral Point Rd rather than in the outside lanes. This avoids buses getting stuck behind right-turning cars. The City decided that cars will continue to get the two remaining travel lanes in each direction. This would leave Mineral Point Rd without any bike facilities. However, the City identified the street as part of its all ages and all abilities bike network, and there have been several fatal and serious injury crashes involving people walking and biking along the road. The proposed compromise solution: expand one of the sidewalks into a shared use path. However, some alders and members of the public have opposed the project because it involves removing trees.

On Wednesday, the Transportation Commission unanimously voted to go forward with the widened sidewalk along the whole stretch of Mineral Point Rd, from Whitney Way to the Beltline. The one exception, to preserve trees, is a stretch along Nautilus Park. There the 5-foot sidewalk will remain for now but eventually be replaced by a path going through the park.

The next step for the project is the Board of Public Works meeting next week Wednesday, and then the Common Council will make the final decision.

Save the date: North-South BRT and bikes

Speaking of bus rapid transit: Save the date for our upcoming November 27 virtual meeting on the planned North-South BRT route and what it means for people on bikes. Find more information and a sign-up link here.

Categories
Bike News E-Mail

November 27: Let’s talk about bikes and the planned N/S bus rapid transit route

A map of Metro’s planned Bus Rapid Transit network. The North-South route (Route B) is shown in green. Image: City of Madison

Madison’s first bus rapid transit (BRT) route, going from Junction Road on the west side to East Towne Mall on the East Side, is still under construction. But the City and Metro are already preparing for a second route, connecting the north and south side. If all goes well, the route could be in operation as early as 2028.

Initial concept for a reconstructed Park Street, with a widened sidewalk on only one side of the street. Source: City of Madison

The project will involve a reconstruction of Park Street, and potential changes to the setup of streets such as Fitch Hatchery, Packers, and Sherman. A lot of these changes will have an impact on people biking, and getting the route and the design right is important for improving our city’s all-ages-and-all-abilities bike network. Join our meeting for a presentation from Metro and an opportunity to ask questions and provide comment!

The virtual meeting will take place on Monday, November 27 from 6 to 7 pm. Register in advance for this meeting:
https://us06web.zoom.us/meeting/register/tZckdeigqT0tGNV7VUb5P303BqiODYk90ppH

After registering, you will receive a confirmation email containing information about joining the meeting.

Can’t make the meeting? We’ll record it and make it available via our website and YouTube channel. You can also send us questions or comments in advance of the meeting: info@madisonbikes.org

For more information about the North-South BRT project, go to https://www.cityofmadison.com/metro/routes-schedules/bus-rapid-transit/north-south-brt-line

Categories
Newsletter Weekly Update

S. Park Street BRT; TC

Madison Bicyclist in front of the Monona Terrace. Photo: Cyclists of Madison

S. Park St. Redevelopment

Wednesday from 6:00PM – 7:30, join a virtual city meeting discussing S. Park St. redevelopment for BRT. Thursday from 5:30PM – 7:30 PM, there will also be an in-person meeting on the same topic in Fitchburg.

Madison Bikes board member Craig Weinhold mentioned these meetings two weeks ago in an in-depth blog post about the sacrifices bicyclists and pedestrians have had to make to avoid disruptions to single occupancy vehicle traffic as BRT is expanded. Bicyclist safety and accessibility on S. Park St. is key to overall safety and accessibility on the S. side. It is important to show up often to city meetings to ensure the city fully explores options to allow bicyclists and bus riders safe and convenient roadway access, instead of pitting bikes and buses against one another while refusing to prioritize safety over single occupancy vehicle convenience.

Transportation Commission updates

The Mineral Point Rd. “widened sidewalk” plans are going to TC this Wednesday. The compromised state of the bike facilities included in this project were also mentioned in Craig’s blog post (link above). Feel free to send a written comment on “Agenda Item 2” to share your thoughts on this, instructions on how to do this are always included in the TC agenda.

As always, you can find an overview of all bike events on our Community Bike Calendar. Email us at info@madisonbikes.org to add your events. And if you value our newsletter and other work, consider donating to Madison Bikes. For construction updates, check out the city’s Bike Madison page.